Things So far...
Jul. 5th, 2008 03:57 pmWell, Friday we biked 7 miles, 15.1 mph. Mel came with me and we then had breakfast at Joe's. Then it was home to work on the 2 pair of fighting pants. Got those done and then I cut out 2 pairs of linen trousers, 3 tunics for mel and 3 underdresses for myself. I still have the sleeves and smock for my kirtle to cut out and called meg about them.
We headed out to a party on friday night and I got to swim and sit in a hot tub. That was very, very nice. Today I've sewn pants (minus pleating), changed out serger thread and am 1/2 way through the tunics. I hope to get everything sewn by tonight and just have finish work and then the kirtle/smock to finish for pennsic. Mel's been working on getting our pattents done...course he made his and then he made me 2 right feet...so cute. So, back to sewing.
We headed out to a party on friday night and I got to swim and sit in a hot tub. That was very, very nice. Today I've sewn pants (minus pleating), changed out serger thread and am 1/2 way through the tunics. I hope to get everything sewn by tonight and just have finish work and then the kirtle/smock to finish for pennsic. Mel's been working on getting our pattents done...course he made his and then he made me 2 right feet...so cute. So, back to sewing.