Reports, Reports and house stuff...
Apr. 8th, 2005 06:54 amSo, today I get to 1) complete a markup of a drawing (hopefully), 2) write my seneschal's report, 2) write my event report for A&S and 3) have the home inspection on the house and get all of my paperwork ready for my business trip on Monday. So, all good, I think. Just need to get cracking.
Everybody, including my parents (my side knows I need to email mom-in-law)is super excited about the house. I've got to email mingo directions so he and mel and richard can kabitz about the workshop. Course last night when mel got home he finally realized that making the workshop space for me just go a whole lot more complicated cause 1) he wants to by me a minor bench set up (oxy and propane tanks, regulator etc), and also in that we've already discussed but he forgot about 2) the annealing kiln (which he really wants to buy me). So, he just realized his open air workshop wouldn't quite work for that. So, mingo will be over for the "brainstorm" for that issue. Plus richard will be there for electrical etc. I think we will work something out...though I figure I can wait until after summer for the setup for my glass and just plug away on the MAPP torch for a while longer.
So, reports and drawings here I come.
Everybody, including my parents (my side knows I need to email mom-in-law)is super excited about the house. I've got to email mingo directions so he and mel and richard can kabitz about the workshop. Course last night when mel got home he finally realized that making the workshop space for me just go a whole lot more complicated cause 1) he wants to by me a minor bench set up (oxy and propane tanks, regulator etc), and also in that we've already discussed but he forgot about 2) the annealing kiln (which he really wants to buy me). So, he just realized his open air workshop wouldn't quite work for that. So, mingo will be over for the "brainstorm" for that issue. Plus richard will be there for electrical etc. I think we will work something out...though I figure I can wait until after summer for the setup for my glass and just plug away on the MAPP torch for a while longer.
So, reports and drawings here I come.